Blog

Trains, haulers and blueprints

Logistics, as it stands today.

Trains

A signal (400 MT) sits on a cell of your track, facing the trains it controls. It can close by itself while a train is in the block beyond, be held open or closed, or run its own script. Your deadlocks are now optional.

Trains also wear: running overloaded, or pushing against something in the way, costs health. A builder robot repairs cars and containers.

Haulers

A hauler still carries one container where there is no track, at 6 turns a cell, on its own 20 kWh battery. It takes orders, not code. Hauler scripts are planned.

Blueprints

Ghosts are free plans on the map, and a builder robot turns them into structures from stock. Saving a group of ghosts under a name and stamping it somewhere else is planned.

For the details, read trains and gates.